  1. A

    has anyone completed 2394/5?

    I've posted on this subject in other areas in this forum but to no avail. I'm taking 2394/5 combined c&g course at a training centre in Manchester on 28/7/14. I only have past experience of IR and cont testing but nothing else. I have gn3 and exam success books in the post to me for some heavy...
  2. D

    training required

    hi all I am new to this board so be with me... I m trying to get into the industry through OLCI training and ive completed level 3 and level 4 of the 2330/2357 (it keeps changing!) and have passed my 17thedition wire regs the final part need to complete is the NVQ whereby you need more on site...
  3. S

    Paid by number of EICR's completed???

    Hi all I discussed a similar situation in a previous thread but the topic keeps popping up with testing jobs that I seem to be attracting at the moment.I got offered a job carrying out EICR's for the MOD and the rate of pay was by the property?? In other words, if I don't knock out 4 or 5 a...
  4. F

    Legal rights to materials when customers don't pay?

    I hope someone can help. I've taken on a large project, new build oak frame house. Customer happy to pay deposit and then money at completion of first fix. Completion of second fix has been delayed as they've run out of money to complete parts of the building but a large part of the second...
  5. R

    Please suggest good C&G courses that is worth considering to improve knowledge

    Guys, I'm looking to leave BT after 9 years. I completed a 3 year apprenticeship before moving in to the planning office to perform the role of electrical designer, and as result I have limited practical experience. Please suggest what courses will benefit me to improve my employability when...
  6. C

    electrical trainee Just Completed My First Rewire

    Customer is happy,so am I (£2000) later for a 2 bed terrace that took 3 days to complete. Reason for posting is I have not even bothered to notify LABC,I'm not registered with a scam! Customer was not bothered about certs etc! Although I've completed Schedule of Tests etc where do I stand...
  7. D

    JIB Electrotechnical Certification Scheme (ECS) Help with JIB card/2330

    Hi Guys. First ever post on a forum so bare with me... Basically I am looking at applying for my JIB card. I have my 17th edition NVQ 2356 and 2330 level 2. Only problem is I never finished my 2330 level 3. I did the level 2 fine and the 301 and 302 of the level 3 but never completed. Can I...
  8. D

    JIB Electrotechnical Certification Scheme (ECS) Jib card

    Hi i completed the 2330 levels 2 and 3 a couple of years ago to the 17th edition and sent off for my jib card which came back with trainee on it. I have since completed the nvq 3 and want to renew my jib card,but do i need to do the 2382 17th edition exam for them to grade me as a an...
  9. S

    NICEIC Certification Scheme NICEIC Submitting a completed Job for the NICEIC members out there

    Hi guys Iv literally just received my official certificate from the NICEIC to acknowledge i am now an approved contractor and domestic installer. I have my activation Code for the site but my question is, how do you go about certifying a Job? I have the Megger software which enables me to...
  10. N6rul

    jobs signed of by third party

    Ok guys have a question. I have registered with NICEIC. As you guys are aware they need 5 jobs to be assessed. Now my problem is all the jobs I have done have been signed off by a third party. Now can I still show them as my jobs and re do the tests myself and certify again.??? Thanks
  11. I

    what documents should be completed after initial veritication?

    of the electrical installation. trying to find the answer on the internet but no luck so far. Thanks in advance.
  12. K

    Danger notice issued after work completed???

    I was called to a job recently to fix a lighting fault (insulation guys drilled directly through a cable in wall of conservatory), easy find/fix.... During inspection of fault, I noticed the main house lighting had no cpc conductor and many metallic switches/fittings were in place. The...
  13. N

    How to completed in PIR Schedule of inspection reporting?

    Hi I am having problems filling in the PIR (Schedule of inspection). Any examples on how to fill it in? May be an easier explanations on how to fill in the report? Or may be an example of one that is been completed already? Many Thanks
  14. I

    what document should be completed after fault rectification work.

    what document should be completed after fault rectification work. At the moment im studying and need a little help on this question. Thanks in advance.
  15. brucelee

    NVQ completed at last

    Hi All, Finally finished my NVQ lv3 took some doing its drove me mad over the last few months I would rather do the 2391 again lol but its done now next step apply to JIB for a card I would jsut like to say a special THANKS to AMBERLEAF as without him it would have been impossible in my eyes a...
  16. K

    2330 & AM2...Whats next

    Hi All I have recently completed my 2330 and my AM2 and I am wondering if i need to do the full 3 day 17th edition course or can I do a one day course or just the exam?? Any help or advice in this matter would be wonderful as cannot seem to get a straight answer from any training body. They...
  17. D

    Arprenticeship completed using JTL

    Hello all I completed my apprenticeship last December using JTL, my employer had to pay all the fees because at the time I was 26. I’ve been waiting for my apprenticeship completion certificate since, so I phoned JTL the other day and I was told that because my apprenticeship was...
  18. G

    sooo EPC's for part completed new builds with provisional SAP assessments?

    Appologies if Ofgem have answered this in their guidance and I've missed it, but we've got an installation coming up on a new build very low energy house (not quite passif house standard, but not far off). Anyway, we're going to be doing the solar PV installation significantly before the house...
  19. A

    NVQ 3 Completed finally !!!

    Finally finally finished my nvq l3 with Xs, thought it would never end :hurray::hurray::hurray:
  20. E

    1st fix completed long time ago.

    Hi all, I have a problem regarding an insurance job I started a few months ago. 1) Flood damage on the house, so I tested /sorted problems out and left waiting for the builders to complete the work they was doing.This was in Sep last year. 2) Since then the owner of the house can not sign a...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock