Hi

the house is in the early stages of sale, the house is not yet signed off by building control because ive been dragging my feet. The building inspector is coming out next week to do final check and that is when he will ask for electrical installation cert. Hope iam explaining this correctly.

Regards
gary
 
i would say its not yet done as no installation cert has been done..
if you can do an installation cert then all will be good..
otherwise its up to how good your building inspector is...after all a pi will show it complys
ive known it go both ways so
a. be nice to your building inspector
b. promise him anything he wants
c. get your building signed off
d. sell your house and forget all about it!!
 
My building inspector is a tidy guy, i do some electrical work for him. I think i will issue a 16th cert and put a recent date on it and then part p it. Do u think thats ok?
THE JOB WAS FINALLY FINISHED ABOUT 12 MONTHS AGO.
 
Last edited:
If you were to issue a periodic with a modern date.see if that satisfies him,dont say you wired it because its an offence

He can issue a regularisation notice,at least thats what I think its called,there is a set price,but not sure how much
Personally I would do nothing unless he asks and then ask him the route that satisfies him
 
Maybe the word offence was a bit dramatic,I will try and explain how I understand the sytem and how you are supposed to comply

For me to use the word offence, may have been presuming a few things(wrongly perhaps):)


Part p of the building regs gives a couple of ways of complying

A person has to notify the works to labc before the work starts and pay a fee
If you have full plans approval, it means the wiring doesn't have to be notified seperately,so the fee would be taken care of by the full plans bit

Part p requires a completion certificate to say that it complies with the building regs

That has to be issued by the inspector after the work has been inspected at first and second fix by the inspector, and testing and certification is then the responsibility of labc

To by pass this procedure,a person doing the wiring can register with a competent person scheme to self certify compliance with the building regs

If neither of these options is taken,then there are ( on paper anyway ) fines for non compliance with the building regs
Those fines ( on paper again :)) are very hefty I was under the impression it was in the thousands
That is why I used the word offence
I am sorry if I have presumed anything eg if you are registered or if you did notify labc

I may well be very very wrong with some or even all of my information,but it may be worthwhile checking

To be a little more positive
Part p is not implemented by nearly every labc in the land
It is not any concern to sparks who dont register .it is of no concern to the millions of people who do Diy
Nobody as far as I know have been prosecuted for not notifying work or for bad installation work
Its a crap piece of legistlation,but on paper it should be followed,or so mps believed, when they enacted the nonesense
 
thanks des

when the work started i was employed and not part p registered but..... by the time the work was completed i was a member of the nic, my fault really i should have done something about it then. anyway i think i need to talk to my building inspector and see what he recons, maybe he will say a 16th cert will be ok if not i will have to upgrade my db with rcbos and issue a 17th completion cert. thanks for your advice

regards
gary
 
Maybe the word offence was a bit dramatic,I will try and explain how I understand the sytem and how you are supposed to comply

For me to use the word offence, may have been presuming a few things(wrongly perhaps):)

Part p of the building regs gives a couple of ways of complying

A person has to notify the works to labc before the work starts and pay a fee
If you have full plans approval, it means the wiring doesn't have to be notified seperately,so the fee would be taken care of by the full plans bit

Part p requires a completion certificate to say that it complies with the building regs

That has to be issued by the inspector after the work has been inspected at first and second fix by the inspector, and testing and certification is then the responsibility of labc

To by pass this procedure,a person doing the wiring can register with a competent person scheme to self certify compliance with the building regs

If neither of these options is taken,then there are ( on paper anyway ) fines for non compliance with the building regs
Those fines ( on paper again :)) are very hefty I was under the impression it was in the thousands
That is why I used the word offence
I am sorry if I have presumed anything eg if you are registered or if you did notify labc

I may well be very very wrong with some or even all of my information,but it may be worthwhile checking

To be a little more positive
Part p is not implemented by nearly every labc in the land
It is not any concern to sparks who dont register .it is of no concern to the millions of people who do Diy
Nobody as far as I know have been prosecuted for not notifying work or for bad installation work
Its a crap piece of legistlation,but on paper it should be followed,or so mps believed, when they enacted the nonesense

I had the building inspector out to me the other day, he came to assess my CU change on my own property which is one of my assessment pieces.

He came out, looked at the CU visually, which is above a door, asked to see the certificate,asked to see my qualifications and that was it, goes through to planning and he said I should hear back soon, that was the one and only time he came out to see me. Simple.
I thought it was going to be alot harder.
Does anyone know if there is a time limit between completing a job and submitting an application?
 

Reply to 16th edition board in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Similar Threads

NICEIC Certification Scheme Getting accredited to
Looking for some advice regarding joining a CPS. I've been in the electrical industry in various roles for nearly 10 years. I started my...
Replies
15
Views
1K
Hello, DIY'er here looking for some advice. In March 2023 we should be getting 5.5kW of solar PV going on the roof feeding into the current...
Replies
4
Views
1K
Hello All, I have just found out that a family member who is having some Building work done has been advised to insulate above the Kitchen...
Replies
16
Views
918
Hello all, I've just been perusing the AM2/E/S threads on here. Thought you might like a bit of a review. If, like I did, you find yourself...
Replies
7
Views
2K
Stroma Certification Scheme What RCD for 18th Edition
I'm a bit late taking my 18th edition update, I've booked for end of November and have my assessment early December. I'm gonna do a Consumer unit...
Replies
10
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock