Discuss Smart meter install assessment failed. in the UK Electrical Forum area at ElectriciansForums.net
...Only two comments... The replacement of tails,is made all the easier,because you have a nice picture of the pre-cut seal....
Other point,is why on earth do you want Smart meters?
See post #30.Dump the Henley block and run new tails in direct.
See post #30.
As suggested by others, probably an issue of liability. His employer probably does not wish to get involved with customers' wiring.No he made a valid point but why not just get on with the job and rectify the issue at the same time, just for the sake of 10 more minutes.
No he made a valid point but why not just get on with the job and rectify the issue at the same time, just for the sake of 10 more minutes.
Reply to Smart meter install assessment failed. in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.