Discuss Thoughts on new builds........ in the UK Electrical Forum area at ElectriciansForums.net

I would take issue with the amount of copper on display at the Main Switch....but its no different to the manufacturer fitted left hand side RCD.

Tails in the Pirelli box are a mess, how far from Pirelli box to Consumer Unit? Don't see a 16mm earth at the Consumer unit?

And over sized sleeving I hate as well:( Right up there with the faceplate screws not being level:cool:
 
Tis a 16mm, terminal no. 3, pic sort of deceives that. CU is on other side of the wall to meter box almost. I normally exit the tails from the meter box, from the bottom to prevent or negate water ingress, and foam up the hole to prevent fauna infestation, and add a couple of securing clips to the tails. Yep bit of a mess.

Might add it to the snagging list. Don't want to be an arse being a sparks and all that, but it is a bit of a mess.
 
Tis a 16mm, terminal no. 3, pic sort of deceives that. CU is on other side of the wall to meter box almost. I normally exit the tails from the meter box, from the bottom to prevent or negate water ingress, and foam up the hole to prevent fauna infestation, and add a couple of securing clips to the tails. Yep bit of a mess.

Might add it to the snagging list. Don't want to be an arse being a sparks and all that, but it is a bit of a mess.
I'd just pull it out and remake it off myself and don't tell them to not invalid guarantee etc. Plenty of slack there to make it neat.
 
Tis a 16mm, terminal no. 3, pic sort of deceives that. CU is on other side of the wall to meter box almost. I normally exit the tails from the meter box, from the bottom to prevent or negate water ingress, and foam up the hole to prevent fauna infestation, and add a couple of securing clips to the tails. Yep bit of a mess.

Might add it to the snagging list. Don't want to be an arse being a sparks and all that, but it is a bit of a mess.
That oversized sleeving hides it well:tearsofjoy:
 
NHBC are jusy as much to blame as theyre the ones who are suppose to inspect these fixes before moving onto next stages, all back handers. I subbed to a contractor who wanted a supply to a detached garage, they want the 2.5 t&e run under the slabs no duct either. Told them to do the job properly and find another spark.
 
NHBC are jusy as much to blame as theyre the ones who are suppose to inspect these fixes before moving onto next stages, all back handers. I subbed to a contractor who wanted a supply to a detached garage, they want the 2.5 t&e run under the slabs no duct either. Told them to do the job properly and find another spark.

Don't quite know what the remit the NHBC has. The developer was pushing for completion before the end of June, they wanted their money (its their year end). Bit of a blip for them, the NHBC said the pan & rad were in the wrong place in the downstairs toilet apparently, i.e. by 10mm to plans! I hear their have to pressure test the property to get a pass by the inspector? Spent a day removing all the mastic from the bottom of the skirtings, ready to lay the flooring, yet there's trickle fans in bathrooms etc?
 
In the 70’s council rewires we’re done in a day,2 men,costed about £250,depressing work,but earned your keep.
The old rubber cable was burnt & sold,any extras you got 50p for each one.
I don’t do houses anymore.
 
I hear their have to pressure test the property to get a pass by the inspector? Spent a day removing all the mastic from the bottom of the skirtings, ready to lay the flooring, yet there's trickle fans in bathrooms etc?
Yes the modern requirement is to have specific controlled ventilation rather than general draughts. The air tightness is supposed to come from the fabric of the building but it seems to be accepted practice to add superficial sealant on the finishes layer and leave it at that.
 
NHBC.... a dog with no teeth:
HT_pitbull_nana_02_jef_150930_16x9_992.jpg
 
so they don't fit air bricks anymore??? damp and mould are far worse than spending a few extra quid on gas each year.
Air bricks are still fitted in suspended floors to keep the void dry.
Air bricks into the living accommodation are not common in new houses because they are uncontrolled ventilation ie depends on the wind and temperature difference etc. Trickle fans are preferred as they give a controlled ventilation in the correct direction in all conditions. If your trickle fans are working correctly and your insulation is continuous without thermal bridges then you won't have trouble with mould unless you are running a cannabis farm!
 
I was on a newbuild last year where the sole plates of the stud walls hadn't been fixed before boarding and you could push the walls and see them move :D
A friend moved into a new build and found that the gap under the bedroom stud wall when the floors were loaded with furniture was so big the wall could be pushed over the carpet on gripper bar.
Builders solution... expanding foam... including all over the carpet.
 
My mum bought a new-build flat, and asked me to put in a shelf over a radiator...it was a simple job, on a short straight wall...
The shelf touched the wall at each end, and you could get a finger down the gap in the middle.
How come, with modern fixings, the builders couldn't get a stud wall straight for just a few feet?
 
My mate a kitchen fitted got a new build a year ago coming in August. He’s been at war with the developer/builder for months now, holes all over the floor above Downlights, gaps round the windows, staircase had gaps, all spindles had to be replaced as they were warped.

He phoned me one day as their spark told him his washing machine that was brand new was obviously faulty.

My mate asked me why it was knocking off the lights yet the lights stayed on, they’d the RFC in the 6A and the lights in a 20A.

Then he discovered the gas line to his had been leaking for 10 weeks and when he got someone who connects for him out to look at it the foreman for the builder came to the gas plumber and asked him not to say anything about something that was missing as they weren’t fitted in any house and shouldn’t have been commissioned.

Some of the snag list he gave was brutal, the developer was kind of saying nothing at a meeting and he couldn’t tell what way they were thinking until he pulled out the cake slice and slid it up the side of a window, then he mentioned the gas and something else really serious and the developer just turned to the builder and glared at him?
They left, returned 45 mins later and told my mate they’d rectify everything on his list. And anything else you see add it on and mail them to let them know.

A £287k home and in this area on a development that’s the most expensive for 7-8 miles in a very populated area.

Though I was in another last Sunday and I thought it was extremely well finished, that builder has a reputation for many years of building a good house.
Only negative I could see was no light in loft and no socket, despite being pre wired for aerials to the loft and satellite to outside.
 

Reply to Thoughts on new builds........ in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

I bought this house a couple months ago. It was built in 1952 (same as me) but has been rewired with yellow 12 awg Romex dated 2007. Looks like a...
Replies
7
Views
513
Have a single plug socket which has been working fine for years. It is behind a unit so nothing has hit it. I looked at the socket and can seen no...
Replies
13
Views
1K
Hi all. Sort of an interesting one. I had a call from a client to say she is getting a shock when using the shower. I told her not to use it and...
Replies
15
Views
1K
I'll start by saying - I have absolutely no intention of doing any wiring or anything electrical myself. You get someone professional to do a...
Replies
8
Views
824
I removed my baseboard electrical heaters (1981 installed) due to finishing off the room. When I had a new AC ductwork installed they changed the...
Replies
2
Views
399

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock