Mike Blair
currently took over someones job on a control 4 system "huge home automated system" due that being an extra they paid my boss separate for this. alot of lighting has Big transformers which had to be put local to the control 4. doing this i had to make connections "wagos and tape" due to many changes ect alot had to be extended as well do design error etc. i said to the customer and also put on the eir noted to client to put 230v sign and locks on electrical cupboard doors.
the customer stopped paying my boss to do the control 4 and leading me not to finish the job. but it is unfinished such as more terminations need to be done. some wagos not taped. cables not zip tied etc and now there complaining saying it is not neet etc? but they wont pay for us to come do it? how do i go by this?
also saying they dont like the way the connections are done. but doesnt the whole system being in a cupboard and taped etc come under barriers and enclosure reg?
im just in the middle like a sunken ship lol
the customer stopped paying my boss to do the control 4 and leading me not to finish the job. but it is unfinished such as more terminations need to be done. some wagos not taped. cables not zip tied etc and now there complaining saying it is not neet etc? but they wont pay for us to come do it? how do i go by this?
also saying they dont like the way the connections are done. but doesnt the whole system being in a cupboard and taped etc come under barriers and enclosure reg?
im just in the middle like a sunken ship lol