uksparks
-
- Reaction score
- 1,228
Hi,
Just a quick question, been to a house this morning which needs to have a fair bit done including rewiring both light circuits as has no CPC and wants a new consumer unit but wants to have his metal fittings everywhere, so he needs this sorting first.
Its a 4 bed house, and the loft is empty, but fully boarded and screwed down with interlocking boards.
1. How much would you say to charge to remove the board and replace? Thats kind of one job on its own, he wants a price so ill give him one, I was thinking, i know its easy ish to remove them, but its a pig getting them back down again in the right order etc... so was going to say something like £175 to remove and replace boards on top if he doesn't do it.
2. The light circuits, its all floorboards, so not chipboard, not really sure how much to tell him, i have never had to just replace a light circuit before so dont really know what would sound too much?
He needs both light circuits doing, so ignoring the removal of loft boards, would you say to £250 - £300 labour to rewire the light circuit or does that sound too much?
Just a quick question, been to a house this morning which needs to have a fair bit done including rewiring both light circuits as has no CPC and wants a new consumer unit but wants to have his metal fittings everywhere, so he needs this sorting first.
Its a 4 bed house, and the loft is empty, but fully boarded and screwed down with interlocking boards.
1. How much would you say to charge to remove the board and replace? Thats kind of one job on its own, he wants a price so ill give him one, I was thinking, i know its easy ish to remove them, but its a pig getting them back down again in the right order etc... so was going to say something like £175 to remove and replace boards on top if he doesn't do it.
2. The light circuits, its all floorboards, so not chipboard, not really sure how much to tell him, i have never had to just replace a light circuit before so dont really know what would sound too much?
He needs both light circuits doing, so ignoring the removal of loft boards, would you say to £250 - £300 labour to rewire the light circuit or does that sound too much?