- Reaction score
- 3,818
Good for him
just use the standard electrical installation certificate.Can I take this thread a different way slightly for a minute, but based on a theme that has already been mentioned in brief. The model forms state they are for installations up to 100A - in the work I've been involved in this has been sufficient but what forms are used for bigger installs? Has anyone got a 100A+ model form, and where would they typically be used?
Thanks
The single phase 100amp ones are just less pages for the full scope single phase brings.