I'm going to look at a job next week for wiring a couple of holiday lodges that are being shipped in a few weeks. The guy mentioned it gets split in half for transport purposes I've never done one before just wondering if anyone had and what's the best way to go about it
I've just installed the modules on a new build, it will be some weeks away before I can install the inverter and commission the system.
How does it work with regard to the EPC. Do I leave the system switched off and the builder ask the energy assessor to issue the EPC for the building and...
Hello. Can someone tell me where can I download paperwork you need to start gathering your portfolio, all I want is to see what I'm up against. I'm looking for the 2365 one. If someone has the pdf file or a link to it that would be appreciated. Thanks.
I found one file but it says it is...
Hi all,
I have been asked to issue a certificate for 2 smoke alarms and a heat alarm that are connected via wireless bases (brk 700 series) which have already been installed by the client.
I have never done this before but need to do so for building control as doors have been removed, hence...
Hi Guys,
I've got a question which I think the answer would be "Yes its ok" but I'm just after a second opinion and think some of you folks might have had experience with this type of set up (I haven't).
I've just wired a new out building which is going to be used as a sort of after school /...
Hi guys, so any (quick) advise on this will be appreciated, I've got my part P, 17th and 94/95 qualifications however I'm not registered yet. So how do I go about issuing Certs and who should I contact to notify my work? I'm in London..
Experienced electrical contractors in Monifieth, Dundee
Established for more than 6 years, Kevin Black Electrical Contractor is a local firm, providing first class electrical services to Dundee and the surrounding areas.
Our team of qualified electricians have more than 30 years of experience...
hi there, I am oscar , working as electrical engineer in a seaport project. I'd like gather some information about building earthing work. Here, it is first time, in that project i saw earthing system both in lean concrete and raft foundation(in some buildings). Both of them don't make any...
Evening all..just wondering if it is a building control requirement to have a mains fire alarm installed throughout the property when an extension has been built or walls knocked through to make a kitchen/diner etc. I have worked on a loft conversion last year and the building control officer...
Hi All
I have read the previous thread on this but just wanted some help with a project we are about to complete.
we are set up already for 3 phase we have a panel board 3 phase with metering to 6 outgoing circuits, we have 5 3 phase boards in the mains room, 2 3 phase panels fed from 2...
Hi all, just wanted some building control part p advice if anyone can help please?
Basically we're having a kitchen and bedroom built on the back of the house. The building plans have come back with conditional approval, and one of the conditions is an acceptable part p electrical installation...
123 submitted a new resource:
Northern Ireland Building Regulations (2012) - Northern Ireland Building Regulations (2012)
Read more about this resource...
Hi guys, its seems everyone has differing opinions on this, including myself. From my research it seems pretty obvious that you can only carry out electrical work on somebodys house if you are part of a part p electrical scheme.
From reading the forums and speaking to local electricians it...
Old Town Electrics
Thread
area
building
can't
certificate
electrical
notifiable
part
part p
seems
works
Hi all, I'm wondering if anyone can shed a bit of light on this for me.
I'm a fully qualified electrician, and have been for a lot of years and all my qualifications are up to date. Technically I work for the local council but we have since been privatized and now I work for a big corporation...
Sorry lads but have to ask about price again.
I have been asked to carry out a Periodic Inspection on a commercial premises by a client.
They have a 3 phase board with 8 way board and is totally full. So 24 single circuits. They have no 3 phase circuits.
I am going to carry out the work...
peterl3986
Thread
building
carrying
commercial
inspection
ireland
northern ireland
out
periodic
roi
Hi guys,
Does anybody know what the rules are concerning new builds and heating systems. Currently going through planning application for a new build and I have heard that gas central heating systems are no longer allowed by a guy from the council and that we need to have a heat pump system...
Hi,
The background.
A church bought a derelict farm about 4 years ago. They demolished several non listed buildings and put up new wood buildings in their place. A new 100 Amp single phase supply was brought into one of those buildings and a henley block used to supply a local consumer unit...
hi guys , please excuse my ignorance but to incorporate RJ45 data points into an existing building does the main incoming BT cable also have to be 4 pair cable ? tia