V
VMan
Ok guys,
On the system design side of things, what is required for the MCS assessment?
Our install is to be 2.25 kWp system, with inverter mounted approx 15 meters from array,and Ac cable to CU about 5 meters away.
i have done some basic cable calcs for DC cables, (to confirm Vd < 3%) and got a schematic for the install, what else would be required??
Thanks
V
On the system design side of things, what is required for the MCS assessment?
Our install is to be 2.25 kWp system, with inverter mounted approx 15 meters from array,and Ac cable to CU about 5 meters away.
i have done some basic cable calcs for DC cables, (to confirm Vd < 3%) and got a schematic for the install, what else would be required??
Thanks
V