A picture speaks a thousand words.

IMAG0292.jpg

Why do they make the top treads on ladders if they don't expect that people will stand on them?:tounge_smile:
 
Part of what I'm currently doing in Qatar is training (very loose use of the term) the local guys in better H&S awareness and 'being an example of UK standards'. In a country where most of the manual labour is Indian/Pakistani/Malay it's a constant battle as life is cheap. Scaffolding that is warped and bent to the point that a 50' ladder would be safer, guys who can't read and have no formal training, harnesses, hi-viz or hats doing crazy things on booms and scissors. Trying to explain to someone why it's not a good idea to mix phases across the same steel work only inches apart and getting the reply 'but this is the desert, it doesn't matter' is just typical.

So before we get all caught up on the finer points of what make of step ladder is better than another, and how the HSE will do this that or the other if so-and-so is caught doing whatever, let's please all take a chill pill and remember that we have the luxury of saying this from being far higher up the evolutionary tree than many others.

I'm currently spending around 8hrs a day at approx 140' up - my safety doesn't bother me at all as I'm extremely well trained & qualified, have years of experience and all the kit. What bothers me is the turnips that will walk directly underneath me and the picker and haven't the slightest clue that I might accidentally kill them in a fraction of a second if I drop something by mistake. Or will insist in still trying to walk around and dodge the engine unit if I've no choice other than to drive it from up (happens a lot in entertainment venues). But they're just a Philipino waiter, right? There's another one waiting in the wings......

I'll take some pics during my day today and post up if I get a chance.
 
Last edited:
One of the firms I use to work for doing site temps got round the NO STEPS rule by detailed risk assesment
Hilti on pole to fix hanging chains
Cables, flexes fed in using rods where possable minimal use of steps
fitting junction boxes made off from podium steps
fittings secured at appropriate height using normal 8 tread step ladders assuming fitting max height of 3mtr
all work done out with normal site times to minimise risk of others hitting steps ( also stopped them moaning "How come they have steps and we cant")
All in all it made more sence both HnS wise as building,stripping,rebuilding introduced more risk of something being missed off scaffolding
 
I am NEBOSH and IOSH

I do the general working at heights regs.

I used to train the HSE Inspectors in my local councils.


I can still deliver them now but no accreditation as its lapsed.

All working at height is the same - Safety Safety Safety




Do everything in your power and you will be fine.

A risk assessment also must include cost - as far as reasonably practicable.

If a customer is only paying you ÂŁ300 to do a job which generates ÂŁ100 profit for the company and a scissor lift costs ÂŁ100 it is not as far as reasonably practicable to hire one in
However if it costs ÂŁ25 per day and you say I need to make at least ÂŁ150 on every job - apart from you not making that in the first place that is not considered as an excuse!


3 years delivering these courses to people who inspect people like ourselves who have fallen off said equipment and ladders - you pic up some stories and the outcome of them


The law states that you as the employer must do everything as far as reasonably practicable to protect those who work for you and those who may be around as a result of your work activities

IT DOES NOT STATE YOU MUST DO THIS COURSE AND THIS AND THIS

That is a recommendation (ONLY) in the approved code of practice and then they dont say you must do this and this!


Your insurance are the only ones who can say you must do a course as they are covering you - yet again you can always change insurance companies

Same goes for equipment you use.
 
Last edited by a moderator:
If you did a risk assessment (RA) and it said that is cheaper then buying a new ladder to reach you extra meter then go for it

I am not responsible for any injury you cause to yourself or anyone else!!!!




Back to real life - NO IT BLOODY AINT!! - lol

Do the RA and take note, do I have to explain myself again?????



hehe
 
Many moons ago a fellow contractor called me and asked if I could give him an hand and bring my mobile tower with me. ok says I.

So gets to site it was at Kent International airport before it was that, and he was in a storage building. Job turned out to be this and that, but it appeared Siemans had installed a new fangled, CCTV system, and in them days CCTV was new fangled, and one of the cameras had failed, and was being replaced.

Any way this building must have been 20-25 metres easy and his 6x4 mobile was fully built, and never even reached half way, he had the 10mt working height platform one.

So I get I need yours Malc to extend into the apex for siemans ............so off loaded mine and off we go so now we are putting mine on top of his .................we are half way doing this and I'm now getting Squeaky B time. Builds it and there we are I reckon we are 19mts on this thing, and 19 metres is a long way, and every movement she is swaying as if in a gale. I gets down and up turns Siemans, who takes one look at this and pales, your joking we get.

After much discussions, and a few more your joking, over steps mate, "his offered us a score to change the broken camera", "as he I say". So now i'm thinking your joking ................so off we go pushing this monster over to the broken camera,Siemans gets the unit and up goes my mate ................down comes my mate and walks over to the van, where he gets out a 7 tread step ladder.

"Malc just a gnats too short, give us an hand" Up we go, this bitch is swaying like a drunk on Saturday. with us lugging up a wooden step ladder. Finally on top of this thing, and breathing is swaying this tower, mate opens up ladder and up he goes, so we are now on top of a double extened tower, me holding on for grim death, my mate is another 8-9 feet up on a step ladder, changing a camera.

We have now got us a crowd, Siemans is having a smoke and a couple of the lads are shouting up, how long lads there's an artic in any minute, I'm sort of bricking it my mate is tugging at this broken camera, and of course we are swaying back and forth.....................finally new fitted and down we come, I have never felt so relieved. Mate have a ciggie, over comes siemans, "lads this shroud needs to go over the connections" not sure if Siemans ever heard more profound language but suffice to say it never got it, and my mate never did give me half of that score
 
Malcolm - cheers mate, you've no idea how much I needed that laugh!
 
There is only one way to be safe at height and that is by abseiling, I used to do alot of tight access abseiling in london and is by far the best and cheapest way in many cases.
 
Haven't had alot of need for it as a sparks, more when i did property maintenance work although you could use it for P.V work and would take away the need for scaffold.
 
Got that t-shirt, too.
 
So what method did Q use to put the beam clamp on in the first place, then?? Bet they never took photo's of that bit.
 

Reply to Overcoming the problems with working at height in the Australia area at ElectriciansForums.net

Similar Threads

If one of your coworkers suffers a severe electric shock, your first instinct will most likely be to rush to their rescue. But first, pause and...
Replies
2
Views
669
Hi all, Just wondering what the general situation is with other people on smaller jobs, do you give a quote or estimate to the client before you...
Replies
6
Views
994
There is a 220 volt electric service line crossing my empty sloped lot going to a neighbor's house. Neither the power company nor my neighbor...
Replies
2
Views
874
Hi, I have a Victron Multiplus-II 5kVA inverter/charger with Pylontech US5000 batteries installed in my house along with a 6.8kWp PV array and...
Replies
12
Views
475
  • Locked
  • Sticky
Beware a little long. I served an electrical apprenticeship a long time ago, then went back to full time education immediately moving away from...
Replies
55
Views
5K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock